-From the remaining M/M in product production, the system can't throw the M/M number to another line, which leads to the loss of the number. Without considering the% recovery, the Bt shear control is used for preliminary correction. M/m does not leave a line, but the number of another line is given.<br>-Allergen M/M pollution problem cannot be mixed, and it is traded in the next code.<br>The problems of -break down and downtime have a direct impact, because every time a new route is taken, waste and m/m meat pieces will be produced.<br>-Some goods found that the shape of the problem was not very beautiful, and the water flowed back, back, back, back, and finally cut off the goods, so that the goods were not mixed back to mo.
การแปล กรุณารอสักครู่..