The northern and central upper heavy rain heavy, about 90% of space. Due to the mass of water is accumulated a lot of dam and the northern and central water retention volume than 80% capacity of the dam have accelerated drainage quickly. The water flooding in the area below the dam continuously. For the metropolitan area and vicinity is likely a thunderstorm with heavy rain somewhere during the afternoon to evening. The mass of water from the north will travel to Bangkok, about 15 days.
การแปล กรุณารอสักครู่..
