Using the chaf channels. Each floor, 1,500 and 1 G-10 building floor area 10-28, building 2 (addendum)Fee for Wiring Fiber from the 10th floor 1 building to building 2 (addendum)Insurance damage during working 50000.-baht (returned after inspection from the Department for maintenance.)The policy cover the damage if the limit of 1 million baht (Yes, the policy is sent before the start of the job.)
การแปล กรุณารอสักครู่..
