Structural design and mechanical working time 3 weeks, we start from a solid work in a program designed to bring. Calculated according to the theory, the factory cut and bring the Assembly structure.
Structural design and assembly work took three weeks, we start design in solid work program to calculate the theoretical cut in the form and sent to the factory to assemble the structure.
Structure design and assembly work time 3 week by we started from the design in the program solid work were calculated theoretically to garment factories, according to drawings and used in structure.