Edited by moving the pieces on stage to Block the trial Drawing and manufacturing jobs, for example, to make a standard approved as once again to use in the next lot.
Modified by shifting the pieces Block to phase and sample according to Drawing was produced for the approved again to use as a standard. In the use of production in lot next.