From the information that can be requested by refrigerator light repair welding head, dragging by the driver will be notified with the Survey officer can personally do?
.Therefore, the repair connected on a Survey the head and tail safe to control the operation of the Sub, batayang and properly. To avoid damage to the electrical system are as follows:
pages section of the GATE 1 SURVEY. Glue line connection of enclosure) must be located close to where most of the connections and the length must not exceed 1 m
2. Glue the tubes required ground.) Put the tank into the soil and want to squeeze in as much steel. Do not squeeze the area as a lump sum or colored grease
this performance KPI control repair time in front of the gate does not exceed 7 minutes/car
.
การแปล กรุณารอสักครู่..
