Operational areas divided proportionally according to the type of work. The lab should include a separateAdministrative room, relaxation and dining, activities, this may be all three sections within the same room or separate rooms. Admin en should be positioned for easy contact third parties.Room sample preparation prior to analysis are provided to wipe soil grinding grinding plants, soil or plants, baking, etc. Chemicals should not be stored in sample preparation. Part of the rooms may be classified as sample locations.Prepare the room and sub aqueous sample If it is a large lab should be broken down into. Specific rooms to prevent contamination between them. This should be a room where air circulation system so that the gas is drawn off and discarded quickly. If you want the design to be air conditioned air conditioning should be used that are higher than normal room volume equal.Room analysis tools and detailed scales. The room should be clean room tool control, temperature is about 25 C and should have approved the vacuum moisture to prevent fogging of the glass and the handle on the steam. Blades of light equipment and rust of the device email e-mail Nick. The tools that cause Smoke or steam should install refrigerant vacuum cleaner away from the room quickly, or extract the tools in this group out, is independent from other tools.Analytical radiation room, or the tools that cause the radiation. Round tool or wall should be lining material. Leakage of radiation. There should be a warning to a person who is not related to.The operating table should have a wide operating area approx 60 cm distance between the table should not be less than 150 cm tall work stand table approx. 90 cm and work table height approx. 75 cm table top should be heat resistant material lining and corrosion resistant. Placement of table 3 can be done:
การแปล กรุณารอสักครู่..