The night after the ship brought repair and make improvement. Washing clean all pipe systems. Change tire replace lapam 1 CD (the vacuum pump for access), change the hose 3/8 (the Cooler out.)
Reusable return it after repair and improve. Clean all water service piping. Change pump seals Replace hoses 1 (suction pump) change hose 3/8 (out of Cooler).
Send back after brought back machine repair and the improvement. Dry clean water systems change, change all seal pump hose 1 (the suction hose into pump) change 3 / 8 (side out Cooler).