- Open air pump and air pump meter readings. The gas tank. - Fan hung out to repair the two machines to be installed at the front casting. Two. - Sweeping plans to change the plug to 2 of 2. - Off pump.
-Open the air compressor and meter readings, wind pumps, gas tank change. -Remove fan repair, 2 hanging on to the casting Department, the installation II. -change the plugs at the Department to draw 2 of 2. -close compressor.
- open air pump air pump and read the meter change gas tanks. - fan hanging out the repair, 2. To install the cast reception 2. - change the power plan that swept 2 of 2. - off the air pump.