According to speak with THB TOC Re: putting Lay out that there will be more hot water pipe underneath the scab on top. Currently monitoring about water pressure, there is enough?
By talking to Brian. TOC Lay out the place where it is piping hot water up to the top under the ceiling is now examining the pressure of the water that is adequate or not.
According to talk to. TOC the Lay out which will walk up to the top, hot water under the ceiling is now under investigation about the water pressure that is enough or not.