Consultants have done surveys, traffic volume (MB) on the main road network along the path train. Surat Thani and Chumphon-education range between 3-2558 (2015) by June 18 performs all six surveys (MB1-MB6), a survey was made to save the data every 15 minutes, which surveys show the position and details in the table 3.2-9.
การแปล กรุณารอสักครู่..