Reasons caused the error in the construction. 2.1.3.1. calculation error, reinforced by information may not even be so careless. 2.1.3.2 the weight specified is not valid. Always keep in mind that weight, engineers loaded the rest defined in thetbanyat is the minimum value that must be used in the calculation. Long range building elements with 2.1.3.3 very much or very late filing period to raise may face cuts of the building more than a moment and shear. A child labour unit, which is usually not what the child labour units, namely due to the difference of temperature between the surface on both sides is very different. Cause the shrinkage of the skin does not equal upper and lower. The quantity of iron that may be greater than that required to get a moment and shear. 2.1.3.4 writing mistake is unclear or incomplete. Some of the information may be a problem as the debate. If the neglect may occur.