The stake has been cutting chips, leading to the pond area, the land loan and then ask the filling back immediately. By the signature of the depth of not less than 3 m per hole.
Pile debris that cut the lead to borrow pits in the soil left unused after asking the soil immediately returned. The depth reclamation of not less than 3 m. Per hole.