Pour the powder in copper connection socket with fused secondary discharge on the bottom and pour the powder packed in tubes, red point, pour all the edges on the.
Pour the powder copper crucible with a disk into secondary below until the end. Pour point and powder packed in red on the edge of the pouring tube end.