PTT Global Chemical Public Company Limited () wishes. Will be put forward to hire a contractor to check the structure of the Cooling Tower No.1 PTTGC-3 (Plant I-4), and other damage. A change to the structure, such as concrete cracking. Peeling and rust stains the PTTGC intended the contract to survey and inspect the damage and make repairs.
การแปล กรุณารอสักครู่..
