Study on construction projects from the bridge over the river Moei, Mae Sot District 2 with the network path cut by the beginning of a new project, separate from the Highway 12 km to 10 + 850 (from the area.Mae Sot).
The construction project that 2 bridge across the Rhone District, with the network, as the route cut. The beginning 12 area separated from the highway project. 10 850 (from SOT).