Install the power Line plug 4, A 4-point scale side installation, side Cabinet, the sides of the SCLP OPS Cyclone Main Line E at the side of the Cutter SCLP and outgoing.
Install the power plug 4, the installation of Line A four-point scale on the side, the side of the cabinet OPS Cyclone SCLP, Side Line E Main Cutter SCLP and the outbound side.