1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before work
3.1. The staff must be trained EHS
3.2 the training content in the control plan performance. To the employee by the superintendent performance
3.3. Practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.4 folding machine - roll, cables and other equipment used to test condition. And other equipment intact. The sticker passed state from maintenance. And allow the use 3
.5 block area of operation, equipped with warning signs. And don't the irrelevant in the practice operation
3.6 equip PPE ที่มีมาตรฐาน prescribed (WI-SR-001)
3.7 check fixture of the target with the legs to strengthen before start work. And every time a modification target position
3.8 not approach leaves folded and rolled into balls while the machine is working 3
.9 while the folding rolls must keep getting rid of shrapnel shell (Mill Scale) out of the machine
3.10 must stop the machine immediately. If there is risk of accidents, such as the work change. เกิดควัน, high heat, etc. 3
.11 banning the use of machinery damaged cases, abnormalities were found to stop using it. And call the maintenance in editing
3.12. Banned has nothing to do with the machinery working instead of strictly prohibited
3.13 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
.