Education The factors that cause the delay of the construction of underground cable conduit. A case study of c/l (Thailand) co., Ltd. with the purpose to study the administration of the company's construction projects and the analysis of the various factors that cause delays in the construction of underground cable conduit. By using the research questionnaire is a tool to analyze and collect data. Distribution of a questionnaire to a sample population. Researchers have defined population samples intended for 2 groups: project owner (Owner) and a group of contractors/contractor (the Supplier) 148, 10 sets of data analysis projects with a statistical computer program finished. To be informed of the level, frequency and level of impact severity (Severity Index: S.I) that resulted in delays in construction work, construction, cable conduits underground to minimise the problems that often occur with this type of construction project and application, compatible with the types of construction projects.A few Parties, and to provide the maximum benefit to construction of underground cable conduit or similar work. The study found that the # 1.0) planning factor in construction. Performance exceeds the duration of the operating plan (Time Schedule), with an average maximum severity index 0.933, # 2.0), environmental factors, and other factors related to the weather, such as rain, the flood program cannot be executed. Average index for MRU # 3.0) 0.929, controls of materials management-tools, construction machinery selection, use the tools-mechanical constructions that do not suit the conditions of work. Average severity index 0.915, ranked 4.0) management factors, the construction side, the lack of a defined management structure (Organization Chart) has an average severity index and ranked at 0.823 5.0) management factors of construction period construction plan b.That inconsistency between the work plan, the owner of the work to contractors. With the average index for the five factors which controls MRU 0.864 mentioned above are factors that affect damage affect the delay in the construction of underground cable conduit. In view of the company's project management CD, AIS (Thailand) co., Ltd.
การแปล กรุณารอสักครู่..
