-To adjust the planned manpower by the Plant for production of Silver instead and make the switch to spray the sides keep up with the demand for green RA buan to Assembly.
- The adaptation of manpower to staff the Silver Plant to produce the spray and the two sides alternately, to keep up with the demand of action is based on the Assembly.
- configure manpower plan by employees Silver Plant were produced for, and the spray 2 side alternately. To keep up with the demands of the บวณ to Assembly .