Order to deputy director of a.. The instead, director of A., end up saving agent for Tei HT. Many. + 50 7. 3. 3 (package) / 4 55 To obtain support information unique feature, down 16 July 5 8. It.The company has to consider include specific features for supplying data server system and basic information display system the sea of one project. 5, on theory, the limitExhibitions of the details as attached. The lack of specific characteristics for the development of meteorological data exchange system. 1. The project due to lift. HT is consider inviting meetings demands on Monday. July 27.5 8, 13 and if at the meeting raised. HT, which mainly due to the company to discuss in the meeting said. To prepare the specific features on
proposed came to consider the next
.
การแปล กรุณารอสักครู่..