Performance measurement, risk control Every work area may be a risk. To plan and control measure of risk will be written in the form RM - 02 risk analysis and evaluation (Risk. Analysis and.Practice of risk control is to be checked. The effectiveness of risk measurement and control will be recorded and stored in files management
.