2-way water diversion Construction of the water diversion or digging through cables connected to the River with flood diversion is the principle that will overfill the water from the rivers directly. Most of the water levels do not drop the overflow flow in river bank, formerly in the usual manner. This will require building control and force the water area. The mouth of the River, connected to several cases string and all water flowing into the water at the new dig. Should I dig rock cables separated from the river late. The original River where the water level of the Canal and digging new ties with the old River is at least. After that it's off the original line River For example, the diversion of water from the River, by West. Access to River diversion, diversion into the area before cooling off to suphan buri province East Sea water diversion Canal, RA p Pat into the Canal 13 Canal 14 and then released by the water part of the diversion into the bang pakong River. Another part of the Canal down to Lord over the Canal into an chit chaiya, the beach or the water diversion Canal to the sea, by the airport. Khlong khok salt. Some of the broken cart Canal. The Canal Khlong Nin and the sea, which can prevent flooding the Hua Hin. From the dash area flood event practically khirikhan When the year 2546 (2003)
การแปล กรุณารอสักครู่..
