The lid on the molding process 1.200
1.320 minutes minutes to cut the hole drilling 1.530 minutes
check 1.560 minutes
lid rod molding process 1.200 minutes
cut the 1.320 minutes
Rall check 1.440 minutes. Pin
the molding process to deal with 1.200 minutes
cut the 1.320 minutes
drill a hole 1.530 minutes
hole 1.770 book check 1.890 minutes minutes
assemble line three pieces 4.250 minutes
the tube spout cut 0.210 minutes
fighting base painted 0.210. Minutes 0.312 minutes
check body punch out 0.210 minutes
deep draw 0.420 minutes
check 0.502 minutes
welding body base 2.550 minutes
.A spout connected to the body 4.510 minutes.
sand excess out welding, polishing 6.750 minutes
polishing in the end 8.450 minutes
Serews screw hanclle on body 10.520 minutes
inspection. 10.622 minutes
.
การแปล กรุณารอสักครู่..