Housing size 178 square meters + 3 bedrooms + 3 bathrooms + living room + kitchen + room + parking list contains a.List of base structure weight (size determined by the engineers Foundation.)Foundation/pillar/beam reinforced concrete (reinforced steel used for steel main text of sugar cane). The size, according to engineers. DefineFloor/ground floor pre-engineered type placed on the partial beams cast with or as specified.Reinforced concrete casting surface parking lots that magnitude by the engineers (and taking the weight down. On the ground.)Wash floors of reinforced concrete cast with the size and weight engineer (pouring down. On the ground.)Flooring materials.The ground floor living room and bedroom. Dining room Kitchen. Surface coatings (specified size tile later.) The price does not exceed 500 square meters each.Ground floor bedroom. Glazed tile surface (specify later) the price does not exceed 500 square meters each.-Big bathroom floor. Glazed tile surface (specify later) not exceeding 400 square metres.-Common bathroom flooring. Glazed tile surface (specify later) price not exceeding 300 square metres.-Terrace flooring Surface paving slabs wood (Cher hotel or equivalent.)The floor store room of coated tile surface (specify later) price not exceeding 200 per square meter.- Garage flooring. Polishing the rough cement surface.The wall.The General construction of walls with wall brick, smooth coating.Large bathroom walls. Glazed tile surface (specify later) not exceeding 400 square metres.-Common bathroom walls. Tiled surface coating (specify later) price per square metre is not exceeded. 300-CeilingGeneral ceilings Use a thick, dense, smooth plaster board, sam, 9 mm joints. Khrao galvanized steel structureExternal ceiling Use the finished Strip frosted conwood Khrao galvanized steel structureSmall balcony. Garage. Concrete ceiling painted decoration.Small bathroom. Use a thick, dense plate 9 mm type sam Board pan. Smooth plaster joints of steel structure khrao Zinc platingRoof.A SOE/roof beams. Steel frame calculation engineering model painted jewelry, stainless steel 2 size. According to the engineer set Roof structures Steel frame calculation engineering model painted jewelry, stainless steel 2 size. According to the engineer setConcrete tile roof to roof with roofing siphaekmonia. Brown. GarnetHeat protection materials. Use reflective foil sheet roof (roof, round top.)A complex man. Conwood wood or equivalentFrog bandCommon frog band Wood 2 ", x4," Teng paint primer wood exclusively.The window.General window. Use hardwood glass window (according to the set)The door.The terrace door. The door of the storage room used hardwood doorFront door Use a hardwood door glassInterior doors, hardwood, painted wood and use it exclusively.The bathroom door. Use the wooden door painted wood, especially the Tips pane.Door-window equipmentA typical doorknobDoor hinge-general window.Window handleBolt action-window.Sanitary wareLarge bathroom with toilet, toilet, price no more than 12, 000 baht/1 series.Bathroom small toilet, toilet upper level not exceeding 5, 000 baht/1 series.Toilet WC ground floor price of no more than 4, 000 baht/1 series. Basin bathroom rates not exceeding 5, 000 baht/1 series. Small bathroom sink is more than 3, 000 baht/1 series. Bath-1 price, $/1 series The price does not exceed 1 bath Cabinet, 1 batch 5,000 baht. Shower big cannot exceed the price of 7, 000 baht/1 series. No more than 500 small shower/1 series Bathtub mixer faucet prices no more than 3, 000 baht/1 series. Taps basin mixer is not more than 2, 000 baht/1 series. SOAP doesn't exceed 500 baht/1 series.Toilet paper holders Raja against no more than 500 1 set.Light rain shower late not exceeding 500/1 series.The airline paid the price of not more than 300/1 series.Taps basin in General not exceed 500 baht/1 series.Large bathroom mirror is more than 2, 000 baht/1 series.Small bathroom mirrors does not exceed 1, 000 baht/1 series. Clothes rack rates not exceeding 500/1 series The jobs supply + water system.1800 litre tank is more than 20, 000 baht.Tank + is the price not exceeding 15, 000 baht.The price does not exceed 3500w water pump 7, 000 baht.Water pump not exceeding 5, 000 baht.Hot water not exceeding 1, 000 baht.Hot water not more than 6, 000 baht.Electrical workThe electricity-saving lamp lantern light + stars not to exceed 500 baht.Fluorescent lamp 18w price no more than 300 baht.The price does not exceed 100 kitchen items, 000 baht consists of.1. batch counter is granite, paved surface.2. gas oven + hood3. hang the cabinet storage4. band frog + old door counter5. zinc-bath + accessoriesSpecial items1. place the pipe system and eliminate termite2. concrete from the fence to NGO vehicle 4 does not exceed 6 m.3. keep the pump and the tank room, size 2 x 2.4. the door5. the two sets of fans6. structural steel rebar, Rebar, steel, sugar cane is a message against the earthquake.7. the excavation, reclamation, soil.,
การแปล กรุณารอสักครู่..