His Majesty the King of the king's commandment in commemoration's Birthday on 4 Dr. was 2,
"... problems of drought, this will be an insoluble problem and among these, he said, must be a little more free gift free rations, water or tap water, this must be pre-cut for Bangkok, soIf we can do this on the day we don't have to speak about the lack of water, especially in the project, and the project has been confirmed and it came to pass, when, more than a month, Narathiwat. Put the project and even though it was the project that does not have to resolve this year or next year.5 or 6 years problem of water shortage in Bangkok will be, completely may be thought that it was 5 - 6 years, so long as it is not too long and during this, we were trying to solve the continually, but if there is a hope that 5 - 6 yearsThe 5 - 6 years, but in fact the project is more than 5 - 6 years the project wouldn't dare say I've done this many years ago, because I'll be there is an objection from the experts from the anti-development projectEven if you don't have to pay a little more now, but if you do it 5 - 6 years, we feel, but if you don't do it in the next 5 - 6 years, the cost would continue to be built up to 2 times, 3 times as ending it will be adjourned.We will have to address, of course, water will become a desert, and I have nowhere else to go. This is not the project is to create 2 of Reservoir is one of the river forest River is another of Nakhon NayokThe use of the Bangkok area and neighboring plain of Thailand for the water, one must know that each of them is used by quite a few in the comfort of an average day use 2 liters per person per day, if they use 2 liter 5 1 this,0 liter is one cubic meter per day if one year multiplied by 3, it means that 5 people in one year 3 million cubic meters in Bangkok, and in the vicinity of this, we have roughly 1 million people, 1 million people were multiplied by 7.Therefore, we retain the 7 million cubic meters in the dam, we will be able to offer people in the neighborhood of people in the Central Region near the Bangkok forever. Then this is not a shortage of Pasak Dam, the first planning capacity 1,3 million cubic meters, but it was left to resolve to solve more than 7 million in accordance with the numbers, and even the Pasak Dam in this one, of course, it is not dry enough for consumption if fill the Nakhon Nayok project will be another 2 million cubic meters. It Dr."
the Pasak Chon permissions is located at Tambon Nong Bua province amphoe phatthana nikhom, Lopburi, and Sub-district, Amphur Wang Muang hunter in Saraburi province area of the project has a total of 1, which is 3 rai of UNESCO details
• This province, Lopburi, a total of 9,6 8 3 rai of land coverage, Amphoe amphoe phatthana nikhom district highways, and amphoe chai artesian
• จัห Temple, there were 8, 6, 2 rai Wang Muang district
the Pasak dam Chon a long clay soil core 4, 8 meters high 3.5 M 4 maximum level of water tank, 0 M รทก. Store the water is 9 million cubic meters
budget operations Total of 1, 2, 7 9 million.
การแปล กรุณารอสักครู่..
