To install the product according to the contract term not exceeding 100 wiring electrical meters, if such a term, the seller will be charged an additional 150 meter (one hundred and fifty) Such installation is installed according to regulations and operating methods of the seller. Which does not include the drilling bit, and prepared a place for the wiring?
การแปล กรุณารอสักครู่..
