Special issue Management queuing factory Case study Siam Golden Tree Development
Limited. In this issue Business partners for the delivery of wood chips from the provinces in the northeast and east. The car comes to wood chips to be used to queue. Sometimes the truck from the countryside to take long queues rain. And the need to sleep in the truck in the parking lot for trucks, the company provides. There is not enough space to accommodate. In the residual product of the distance, waiting for a tow truck used. Causing problems for truck trailers by far not enough. When the car left holding a lot of long-distance truck trailers used to take the time to wait for a long time. And delays in the call queue and wait for a tow truck used as remote queues used to be a problem during rush hour roadside parking area
of this research is to study. And a timetable and schedule used for long-distance truck trailers. To shorten the waiting time used. And reduce the residual period of waiting for a tow truck used for long distance. In order to enhance the long-distance call a tow truck and used
to manage the queuing factory (Queuing Management) factory queuing problems. Even considering Causal loop Diagram is not the primary cause of the problems. Because of the congestion in front of the plant caused by the lack of good coordination with farmers. But the problem of queuing in front of the factory, it can be mitigated. The guidelines Scheduling the plant from the crowded factory. This caused the company's business product simultaneously causing queuing page Plant. It pollutes the environment around the plant, from the parking ingested. And may be sold to other factories if material had to wait a long time. Therefore, the group has proposed the scheduling of transporting raw materials to the factory. To ease congestion And can handle the transport of raw materials into the courtyard Nong Fab has continued. The delivery of wood chips Siam Golden Tree Development. A table called hybrid trucks with lock queue. And free queue Consider developing mechanisms for the entry of trucks regularly. Should be given the benefit incentives to encourage truck came into wood chips on time and the number of cars in the courtyard of Nong Fab system without running the truck into the factory (cue free) system at the plant is currently used in a system. cause the density and queuing in front of the factory. The arrival of the trucks will head up the intensity. During the pre-brightness and light Bus Time Table The system has been running the truck into the factory (cue Lock) Factory can set the number of cars that will deliver raw materials to the plant. The consistency and reduce the density of the vehicle at the time of delivery. The proposed change to the car factory into a queue all the locks. To transport wood chips of the company's business into the ground Nong Fab before, without having to wait in the parking area to wait for a call queue. The company will not have to wait long business partner. And can transport the material to the court Nong Fab immediately.
การแปล กรุณารอสักครู่..
