Then, in November, 2556 (2013) onwards Researchers have broadcast system maintenance the machine factory case studies be carried out manually, and then stores the performance for a period of 4 months: November. – The month of January, 2557 (2014) to bring up compared to before you can use the system maintenance. I found that there are a number of times, or the frequency of machine breakdown is equal to 2. There is no inspection machines according to the standards laid. Moreover, the factory case studies lack the personnel responsible for the direct system. Make a rate equal to the average of 99.There are 89% average time values between machine damage equal to 35, 026.67 the expense occurred minutes after the failure of the machine equal to 26,345 Thai baht from book X of spare parts the most secure. Wages and overtime, workers repairing a machine from an external authority.
การแปล กรุณารอสักครู่..