Excess phase out Crane is yes. This event combined load of 50 kg (the last time Pym sorry) do not know how to reduce its size. Crane has specific? I will consider with
The term is too out crane? This load as well as each other. Just 50 kilos (last time, Professional liability We are sorry) don't know how to reduce the size of crane, sir, with regard to it?