Documents, guarantee the safety in the use of boiler
I, you, Israel, Poon loyalty, age 42 years professional engineer.
staying at 52 / 8. The 2 lane / alley - Road -
district / District, garden district / county, city, province city telephone 081-4045-152.
.The workplace, and general electrics, international operations. The company, Inc., located at Rayong telephone 081-4045-152.
get professional license control engineering. Mechanical engineering according to the engineers, the 2542
.The serial numbers, and / plus / carry HM. queen Sirikit3748 since the day 26 July 2555 to date 25 July 2560 and not during the suspension or เพิกถอนใบอนุญาต. According to a copy of ID card attached comes.The 6 - 57-1195 31 expired on DecemberProfessor 2560.
I the compressed water test and check the condition of the boiler of the factory, Siam Power Generation Company Limited.
, which is located a number. 55 / 1 mu 5 lane / alley - Road, highway 3143.
.The district / District, Nong lalok district / county home camp, Rayong province telephone 038 - 923 - 950.
operate power plant size more than 150. Factory registration registration 3-88-1 / 40's whims. Expiration date 31 Dec 2558.
.The factory license name Siam power generation company limited number of workers 60 people
test on 15 August 2558 time 8.00 - 20.00 PM. This factory has the whole machine boiler 1
.Boiler machine number No.1 while check the boiler another machine in top condition. is used. stop
.I test of boiler this machine by the compressed water (Hydrostatic Test) not less กว่าเกณฑ์ compression water pressure test as specified in 4 page of this document.In the front of 2 3 and of this document. I examined the state and or test correctly according to engineering. And boiler, this machine can be used safely for 3 years since test, pressure.No more than 97.1 99.4, bar (g), 28.9 28.5 HP, bar (g), 6.1 5.9 IP, bar (g Deaerator.) I will sign it is
(sign)... To... To... To... To... To... To... To... The...... (sign)... To... The... The... The... So... That... The......
.(Mr. Israel Poon loyalty) (Siam Power Generation Company Limited)
engineers inspectors test. The factory license
first screening test. Please read the details in the face of this document 4
.This machine is a boiler steam boiler. ship train , piggy, , water is imperative. pipe water stand
adapted from boiler furnace - other Other (please specify) - use it 5 years
serial number DKS-2801-H01 created by DAEKYUNG.The maximum pressure at the 98 / 29 / 6 bar (g).
temperature 540 / 280 oC production rate of steam 177 / 30 t / hr. Surface area get hot. Super, heater 16 795 M2 Evap 79 267 m2, Eco, 48 207 m2.
HP boiler movement, boiler never ever when.
.The name the boiler. You wittawat culture laugh, registered company number 314-616-39790 expired December 31 2559.
ชื่อ controller of boiler You too late registration rights, jeera, number 314-616-39789 expired December 31 2559.
.The name the boiler. You chatchawan accessories Si registered company number 314-616-39549 expired 31 December 2559.
, 1. The boiler
on sheet steel boiler, a connected pins repeat, shell thickness, boiler 82 mm.HP Drum 22 mm. IP Drum.
.Insulation and boiler no has a fiberglass, Asbestos refractory brick. other.
size หม้อไอน้ำ . 1.82 m. Long 12 m. 1.3, M. Long 7.5 m. Fire tube size, the stone-curlew - of - tube
fire tube small in size, - long - and - tube
.Water (for boiler pipe) size Wall tube 38.1 / 50.8 mm. Long 24 m. The 3 906.
wall furnace pipe, size L 32.14 x W 8 x. H 24 m. Thick 6 mm. The front wall - after (End Plates) thick 6 mm...
coolant steam (Header or Steam Dome) size. -
channel one (Manhole). no . There were 3 channel,Hand hole (Handhole) no have the clean water channel channel
- (for boiler set แบบท่ water blocking) no . Number of channels among a
steel Stay Rod size. number-one set
Stay Tube size. number-one set
. Gusset Stay thick - front - back - A
series other - number.