2) The problem of controlling
the success of its implementation depends on the ability to control which means the ability to measure progress or results of the implementation of the policy, plan or program to the problem of implementation. If you add more responsible policy that lacks the ability to measure or control the work of the compliance unit. The control problems are more or less depending on the conditions. Many of which will have a direct impact on the ability to control or measure the progress of the operations to be able to meet the requirements of the policy. At the same time, it has a direct impact on issues such as policy implementation capacity of the agency responsible for converting the policies to be outlined. Into practice projects and programs that meet the needs of policy. Activities of the policy, plan or program that is intended to clear it. And defining the mission as well as standard operational practices consistent with the plan or project that
barriers to oversee implementation of the policy of the Government of Thailand. During the year 2501-2540 experiencing difficulties in monitoring government policy or project seriously. The director of public policy in the past, mainly in the form of official visits by the public servants who come to visit the project or track the progress of the assignment policy. The agency also prepared a summary of policy implementation report on the implementation of the policy. The content of the policy was presented to the Panel clear as it could be. The political conditions in Thailand are rotating into power by the military or the civilian government reshuffle all the time from the year 2475 - 2540, the policy into practice its lack. the lack of regulatory control of state policies. The actual implementation of policy into practice. The burden of civil servants who have to bear the direct supervision of public policies throughout the country, however, after the promulgation of the Constitution Act 2540 and the 2550 structure of governance and accountability through increased concentrations. The mechanism of free enterprise But the problem is still present through efforts to control or interfere with these units periodically. In particular, the government of Thaksin Shinawatra 3) issue of cooperation and resistance to change can be said. Barriers in bringing the policy into practice in a collaborative and opposition to change the essence of the problem is handed down to the present is the lack of cooperation from the public. Sometimes people Bundles Combined to defeat Such as during the years 2541-2542, the group protested against the gas pipeline from Malaysia, where government policies are purchased from Malaysia, the government must review the route of the new pipeline. Or a combination of public opposition to the dam floodgates closed. People affected Suffered a call to open the floodgates. Finally, governments need to adjust policies to open the floodgates dam the demands of the people in this case noticeable. Another theme will be the key issues in the future. Is the integration of provincial powers. And a large district with lots of buying power. Has objected to the trade liberalization policy that states allow the department stores, large multinational to set up in those areas. To affect the career of a local civil. Public policies implemented by the government that the public did not share the initiative. Would be counterproductive And lack of cooperation Until the 2550 constitution must have provisions for government agencies. Or any other organization to undertake a local project in Thailand. If a project that will cause a penalty. Or an environmental impact The project must receive the consent of the people in the first four) issues of power and relationships with other organizations involved in the implementation of the authority and the relationship between the organization responsible for implementing the policy. compliance with other relevant organizations There will be more or less depending on several conditions, such as contact and relationships with agencies that control units have such a policy imperative that the authorities must seek practical cooperation. Or agreements with other agencies. The possibility that officials of the agency will be able to work together on problems and obstacles. The importance of bringing public policy into action at birth. The lack of coordination Lack of cooperation between agencies Or private sector organization In Thailand, the issue of integration in practice. The government will always cherish the mission. I do not want to hit the other agencies took part in the mission of their own. Sometimes it is found that the agencies responsible for implementing the policy into action to prepare themselves to complete the mission did not rely on tools, materials, equipment across the entire agency that aims to create well-being for its citizens as well. For example, in the past, These projects provide drinking water to rural residents per capita consumption has sufficient authority. That said, many mission agencies such as the Department of Community Development. Accelerated Rural Development Center Department of Mineral Resources Provincial Administration Organisation Are the agencies that drilling water wells for all the people. Instead of joining the mission carried out in drilling activity and a single agency. The current government of Thailand has set a fundraising agencies with overlapping missions together. And a system integration project to meet the needs of the public to look into the practice of multi-agency coordination to achieve its objectives in a more concrete problem.
การแปล กรุณารอสักครู่..
