Filling or even override the pipe or drainage, sewage will be transcribed as soon as possible to fill up after putting the pipes and be verified by the signature of the return is transcribed in the houses. When crusher and thickness must not exceed 15. Cm and Crusher are done, the density of not less than 85% of the standard (the STANDARD PROCTOR TEST) tightly.
การแปล กรุณารอสักครู่..