1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before operation, 3.1
The staff must be trained EHS
3.2 signal providers crane (Rigger) must have knowledge and trained
3.3. Practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.4 the training content in the control plan the performance to employees. Before the event by the superintendent performance
3.5 Overhead Crane used must pass the examination of th 1)
3.6 inspection and the size of the monkey, and the gasket, electrical safety equipment other that ready to perform lift
3.7 check weight to lift the comparison with coordinates to lift Overhead Crane to level can get weight. Give away from the floor, and as low as possible
3.8 check used communication tool that is in good condition. And workers team everyone understand the hand signals or radio
3.9 check before the work in a day. The check system of brake,Limit switch button press and various in quality
operation
3.10 wear PPE device with standard setting (WI-SR-001)
3.11. Check the height, width of the workpiece to move 3
.The sling 12 order. Support angle and sharp or may slip with pads or wood and tie the rope control work done
3.13. Tie force direction work raised every time, to prevent rotation and swing of the target
3.14 check around the side rails run of crane both longitudinal (End carriages) and transverse (Girder) (Runway Beams) was raised to prevent accidents by direct Or indirectly
3.15 no equipment other assemblies. Not through accreditation is strictly prohibited, such as Pulley Lifting Bar,,, etc. Sling Shackle
3.16 lifting vertically in the center of the series (weight not exceeding 5 degrees from vertical) don't drag หรือจูง. To prevent accidents that may occur from the induction of the workpiece. Including damage prevention of the monkey.Other pieces on the upcoming target while lifting up off the floor!3.17 workpiece lift must have a weight not overload stated on rails transversely (Girder) of the crane electric each set. Lifting weight overload not only cause the device usage shortened.3.18 when hit the wrong way or workpiece swing to wait to work stops. Then press it in the right direction. To prevent the cast of the target
3.19 don't hit the Jogging because it makes the motor burning. And don't hit ย้อนทาง immediately. Stationary crane should first. It made the gear damaged
3.20 lifting workpiece speed lift slowly. The first stop on the slightly high. To observe the slings and lifting equipment various while friendships, to ensure the safe condition. Thus picking up
3.21 avoid lifting workpiece across the device working tank material various dangers, no staff, and those involved in the target the lift. Passengers on the workpiece or lift
3.22. Supervisors must closely
3.23 don't cast a press of a button, or the chimney to impact with objects around, while stop use it could be ปุ่มกด damaged
3.24 when the use of pulleys to move the hook in the position above the head. Then disconnect switch emergency lights red series force pulley and turn off the lights Main everyday
3.25 lighting, light enough. Are not allowed to raise in the light is not enough in the corner and dull and in a place considered high risk. If necessary, inevitable, will be the comprehensive planning meeting with the Department.