Updated sieve drain around the building (550 m) road traffic lines painted buildings
ground floor and 2 floors parking slot B breaks. In the best residential
rooftop waterproofing work/52 floor terrace repair building structure cracks
.System to pass through-out the best residential (Condo)
install the CO2 fire extinguisher 10 lb size type, install an electric charge in the middle class. A number of leading 48
improve lighting to illuminate the building (LED)
CCTV.-Improving the system and CCTV CCTV installation point for Office, residential (Condo)
-closed circuit television system adjustment (DVR, system wiring)
.
การแปล กรุณารอสักครู่..
