Process (Process)
1. split each group group planning meeting 3 people acting in the position
2. select topics to be studied in the project.
3 ... preliminary studies from various sources, such as books, internet, etc.
4. Meeting to plan the project. Determine how long it will take to complete. Determine the costs and methods studies. 5
storage, preparation of materials and tools, operational data administration
6. study into a project to present
7. Compiled data, data validation, and problems analysis. 8
bug
bug fix project 9. Verify the task successfully before the proposes an action method
(Practice)
1. substrate preparation materials
1.1 prepare A 4 size paper, glue, scissors, 1.3 1.2
color 1.5 1.4 information from trace
2. operation procedure 2.1 fold paper in half and
is divided into 2 parts by volume 2.2 image
adhesive
2.3 use the information obtained from research Be considered a category classification in accordance with each country's flag symbol
2.4 apply to each type of symbol is cut and polished, it was in the book
2.5 Pop up by national flag symbol
2.6 to 10 Pop up books, magazines all about ASEAN national cuisine.
การแปล กรุณารอสักครู่..
