From the result of simulation production line, know that the time 1 days or 460 minutes at work.We defined for simulation. Not enough to produce the brake line according to the number of the customers want is 386.However, this pattern can be produced only 242 lines or 121, which makes us have to try.
การแปล กรุณารอสักครู่..
