When a sensor cycle is working, the battery will power through the Inverter circuit to convert DC into AC power inverter 220 volt power to the LED lamp 9 watt bulbs by number 10, this project is an experimental performance of the battery power to the load by the way, is measuring the losses in the battery through the inverter while it is loading 10 tube lighting up the performance of the battery power to the load time of 19 hours, compared with the energy in the battery 120 amp per evil modules.D each day lighting load is powered by the battery, 10 hours a day and you will see that the lighting in the load average using battery power, full time 1.9 days battery power will therefore establish working team has designed the system. Doiwongchon comparison of voltage charger serves as a switch in the circuit editing control, low battery, power transmission. To power to the load the load on some days.
การแปล กรุณารอสักครู่..
