When the test is whether the electrical system within the Server power to the equipment in the room. Air conditioning. Make the switch to the operation of the air conditioning.
When testing the electrical system that has room Server, make sure the power supply to the equipment room. air conditioner Make sure to switch on air conditioning.
When you have a test system within the room Server do test power supply to the equipment inside the room, air conditioning, switching function test of air conditioning.