1. a number that is printed on the tank IBC.-When the meeting. You can query to the production Department whether flouresce or glow to the ranking numbers?-Cylinders number 1-100, type the numbers 1-100 on tanks respectively.-Tank No. 101-110, type the number 101 Rework – 110 Rework.For example, 2. ATEX ZONE • Meeting time. You can consult with a Department that is flouresce or glow produced and will return.• Within the IBC tanks should be 21 when filling the tank interior Zone is to spread the distribution of Material which has the opportunity to explode because of the fat in milk, and must have a Grounding system.• Outdoor environment must be a Zone 22, so. Outdoor equipment, means equipment that is exposed to the environment must be a Zone 22, because all Cabinet lighting Cabinet would chanan in Zone 22 and IP 65 dust.• Wash the Air station had a fu material will have the chance to specify JavaScript rentals due to wind pressure is used to clean so wash station should Air Zone 20. • There is no Safe area any equipment.• Discharge the Discharge station station is in Zone 21 Zone 22 and is.• To establish Risk Assessment MATCON by Nestle. 3. Delivery• From ever talking to a company's procurement division club trick. The Purchasing Department has sent its concerns because it should have been a part of before after the deposit business 2006. So the way it planned MATCON works in the style of each lot shipped to split. Shipping is divided into 2 sections:1. Item Item 1-3 and 5 (see document Ref: Matcon 144,394 Proposal System Rev C) – will be transported by sea from England and Thailand will arrive the country in the last week or last week with 10-Monday February 29, according to the attached table 1 and 2559 must allow time to process customs 1 week, so must be transported to the. Pacific company. Hi-Tech in week 11, or weeks with Monday March 7 2559. 2. Item 4 – IBC tank products are transported by sea from the Czech Republic to 16 the number of tanks that are lotla by the significant capacity is 64 the process means that the plant can continue to produce when the tank in the factory for at least.• Raise the blade by 64 tanks are transported via sea from Czech Republic and Thailand reached 64 countries in the last week or last week with 10-Monday February 29 2559 (along with the item Item 1-3 and 5) according to the table 1, attached, and must allow time to process customs 1 week, so must be transported to the. Pacific company. Hi-Tech in week 11, or weeks with Monday March 7 2559. Remarks by the first lot arrived in in January 25 2559.• Complete 110 (46 the rest), the tank will be transported from the Czech Republic by sea and arrived in Thailand reached 110 countries last week 13 or week is Monday March 21 and travelled to 2559, with another 2 weeks of customs processes, therefore, must be transported to the. Pacific company. Hi-Tech in week 14 or a week with Monday March 28 2559. It is that everything will be transported to the Pacific company. Hi-Tech everything in the last week or last week with 14 Monday March 28 2559 and installed in April.Ta statements of companies difficult to nest loe transport less. Before there was talk with the Purchasing Department of a company would be netle shipping parts to come in Thailand after the first installment payment. The transport tank is scheduled to perform the IBC will be transported as lot 7 lot 16 a and other marine company 1 lot Pacific attempted to gather and discuss with the transport company to MATCON reduce transportation time and talk with company statement, nest the following three. When the equipment arrived to the Pacific company. Hi-tech company will check. Verify the components make FAT approximately 2 weeks to make sure that the device is working. Then we will be able to be installed by service company well there Ta nest set to Pacific fik. Be able to perform the installation for a period of 2 weeks, meaning that the company Pacific time to complete the installation and start up to 10 working days for the rest of the day and 4 2559 Ta service company well into the nest to clean store and wait for the results to reduce micro-step quality check. The company nest and lay emphasized that it should be deleted to eliminate the sharp jagged cleaning oil stains and get rid of the moisture of the IBC tanks come complete.To begin the installation operation may begin around early April could be a day 3-April 16 2559 times are subject to change and will need to have a meeting to talk to OK the installation at a later date. The scope of work in the three-day period, will include an April 16 2559 demolition machinery and equipment with a 2-day Pacific company. Hi Tech sees that period might not be sufficient due to the moving tank IBC will continue to transport the tank for a long time. The nest, it's recommended to transport three buckets from Pacific fik arrive comfortable support company of about 29 netle navanakorn 2559 March 30 when the tank is or was transported to the factory comes to the nest play loops the installation khonkon. Through the factory must prepare the space for the IBC tank to drop enough. Approximately 20m x 10m in this section is not yet clear, so it is necessary to conclude meeting discuss procedural details again in February.The company Pacific will make plans to work with the company, netle. When all the equipment from the truck, it must be stored in areas where the plant provides. When it is introduced into the plant must have a clean, modern factories, and import to tree or to another free from infection before and then imported into the factory. Place was clean but adidas must avoid using the bathroom frequently because of the water cause various infections. 3. ApprovalMechanicalThe Load cell Discharge Station At the bottom of the discharge station is connected to the sieve tray in the meeting says the Pacific konborisat fik has done to alter the cover sieve tray access request from the oval shape is a circle-shaped so that it connects to the statement by the Vitara BFM companies will send a drawing and nest three pictures of sieve tray, with the company Pacific fik. In addition, they want to increase the length of MATCON adapted out of the discharge station No. 2, 3, 4, 5 (for the neck) so that they can be tagged as ตั้.
การแปล กรุณารอสักครู่..