5. material quality. Tools and luggage5.1 tool and equipment in construction contractors, are solely provided by construction materials, including the baggage necessary for construction. The contractors who provided both an end which must be suited to the characteristics of the work as specified in the plan details.6. the insurance portfolio6.1 within the prescribed period of one year from the date that the employer has been that this contract. Home inspection and components already. If there is any damage occurs. The contractors willing to do to repair the damaged section. To cut off funding of the contractors.6.2 exclusion of damage caused by natural disasters such as flood, storm, earthquake, fire, damage from insects, animals, war, riots, theft of the contractor is not responsible to repair.
การแปล กรุณารอสักครู่..
