Diameter reinforced concrete pipe is 1.50 meters long, 50.80 meters, located on the left bank of the dam, sending water into the main canal was 9.10 cubic meters per second. Can supply water for the irrigation of 63,300 hectares.
การแปล กรุณารอสักครู่..
