Including the mining area to the landfill area, there are no potential due to studies in the area of the Park, and the Department is limestone so it is necessary to have a feasibility study before.
The landfill mining site did not study because of the potential in the area of the National Park and features a limestone require a feasibility study first.
The landfill mining area does not study the potential because it is in the area of the Department of parks and the limestone needs to have the feasibility study.