By the production line the pump body has the transportation process raw materials mainly divided into the material gain from retail distributors stored also stock to wait for the disbursement of materials used by the แผนการผลิต.To the raw material to the sheep plastic wrap and verify the size, length, width, thickness of the steel plate to meet the standards set
.From the study of the basic problems, it was found that the waste generation in production process, such as steel plate's tear while stamping due to quality problems of steel.May lead to the loss of many, that is, if the problem cannot be solved. The company was unable to deliver the car to the distribution. Lose the production costs go in vain.By that point should be organized to investigate the quality of steel before production process to reduce the waste generation and prevent other problems that followed due to raw material not quality
.
การแปล กรุณารอสักครู่..
