River basin development project forest, a royal province and Saraburi province.On 19 February 2532 King Bhumibol, HRH Princess Maha Chakri Sirindhorn, Department of ชลประ.Eat, feasibility study project dam store retention pasak to solve the water shortage problem inFarmland pasak River Basin. Mitigation of pasak River Basin. Bangkok, which first.Before that, the king. The Royal stream meteorological department. The installation equipment. Track.Rainfall and detailed reports all along.On 9 January 2533 the cabinet agreed to the feasibility study of the project by the office.Located as the core and support the budget, and on 4 July 2534 foreign minister กปร.Had an appointed board. The study of dam to store water by the pasak located.Chairman, later on 3 May. 2537 cabinet approved the Department and government.Involved the following project by beginning construction on 2 December 2537 and use the project name."The PA sak river basin development project due to royal".The important. Construction of the dam consists of a length 4 860 meters height, 31.5.Meters capacity 960 million cubic meters (maximum retention level + 43 he added every) and assembly buildings 3 of construction.The irrigation system in the area 135 500 farm, and construction of the dike 2, total length 6.055 kilometers.Map projector in tumbon ongbua phatthana nikhom District, Lopburi Province, the affected area included.105 300 farm, covering 2 province 4 district is divided into 65 15 District Village- province were 96 658 farm District, 3 include phatthana nikhom District tha Luang and district ชัยบา Dal, including 13.District 60 village.- province were 8 642 farm District, 1; Wang Muang District, including 2 District 5 village.
การแปล กรุณารอสักครู่..
