Because the phone is unavailable for a long time, and the main communication way EGAT will use a direct call from a parent, including sending a Fax from the EGAT, which received a comment from the EGAT that it cannot contact the power station in khondai calculation multiple times through the telephone number that is not in accordance with the rules of the Grid Code SPP and therefore deserve to be leading the telephony subsystem within the same routines to follow rules SPP Grid Code.
การแปล กรุณารอสักครู่..
