6T machine. Is equal to N, the average NG 1604 12.01%, because it is a new production for the first time, and is a flat.This will set up the machines, including small to set up machines in each task in terms of speed (Speed.
Air 6T is equivalent to 12.01% NG N 1604 average for a new job. First production is flat and which will be set up, including the MPC. Also incorrect settings on each task in terms of speed (Speed.
6T machine is N 1604 average NG was 12.01% because of their work. Produced for the first time and is a flat which will set machine, as well as who is also set wrong in each of the speed. (Speed .