5. The semi bridge road is a temple entrance
6.). Preparation of electrical and water supply throughout the construction inside the temple is a temple
total amount total. 40 education, exhibitions, exhibitions, bath (four hundred million baht).
work to the public.๒๕๒๔ has established "the foundation's wave." The fruits of the foundation in the merits of various congregations and persuaded the funds for โอกาสต่าง, to the present period18-21) included contributions to the public outside of the temple. Money is all the 23 education, exhibitions, exhibitions, bath (two hundred thirty million baht). Processing all the construction is as follows: the construction inside the temple is a sum of money of 40 education, exhibitions, exhibitions, bath
.Construction outside the temple is a sum of 23 education, exhibitions, exhibitions of the approximately a smuggling ๖๓๐, exhibitions, exhibitions, bath (six hundred thirty million baht).
BC1986 arranged offer capital to the religious studies 7 2 of throughout the country of each one hundred thousand to นำไปตั้ง is the foundation to Pali acclessiastical education incentral area academies. In the name of phramongkolthepmuni (wave), all the factors include 7, 200Exhibitions of bath (seven million two hundred thousand)
.
การแปล กรุณารอสักครู่..