This weekend's plan EG with PE would make cleaning safe control of all DC 8 engines, gas pipes have been painted and cleaned the dust and the veins inside the parking lot hit Sunday, 5/07/15.
This weekend's plan to EG with PE cleaning cupboard control of DC All eight machines are being refurbished pipeline. And clean the dust Parking and Striping On Sunday, 5/07/15
This weekend's plan to PE EG were cleaning safety control of DC all 8 machines have painted gas pipe, and clean the dust. And draw a parking lot in Sunday 5 / 07 / 15.