1. construction of embankments, dirt width: 8.00 m long high-capacity: 15.00 m 247.00 m. catchment level. 254,500 m3 2. the construction of the drainage to overwhelm the table pour (San drainage overflow width) 1. Table width: 100 m, Pur Long, 160.00 m high, 1.20 m. 3. building on the left side of the hose length 0.50 m 100.00 m. 4. release the water into the original River system to mine water Weir against the end of the. 8 bar, covering an area of irrigation areas increased 1179 1679 Rai Rai.
การแปล กรุณารอสักครู่..